top of page
OUR PROJECTS / SPOTLIGHT

Bogue Falaya River Modeling

Government, Local
TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-78.jpg
TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-127.jpg

The Challenge

St. Tammany Parish and the Greater Covington area were experiencing major flooding due to the frequent rise of the Bogue Falaya River.

TBakerSmith-LifestylePhotogrpahy-2024-TheUnfoundDoor-200.jpg

The Solution

TBS performed hydrologic and hydraulic modeling as well as topographic surveying services of the 85,000-acre Bogue Falaya drainage basin in an effort to develop an engineering solution to lessen flooding impacts to St. Tammany Parish and the Greater Covington area. The solution includes potential channel improvements and master planning a series of regional detention ponds located at strategic locations throughout the Bogue Falaya drainage basin.

Services

Feasibility/Planning/Alternatives Analysis

Unmanned Aerial/Laser Scanning Surveys

Hydrographic Surveying

Subsurface Utility Engineering

Environmental Studies/NEPA

Levee and Pump Station Design

Engineering Design – Civil & Mechanical

Administration and Management

Grant Applications/Compliance

Program Management

Topographic & Boundary Surveys

Hydraulic and Hydrologic Analysis

Drainage Impact Studies/Master Drainage Plans

Regulatory Compliance/Environmental Permitting

Bulkheads

Grant Writing

Construction Services

bottom of page