The Challenge
St. Tammany Parish and the Greater Covington area were experiencing major flooding due to the frequent rise of the Bogue Falaya River.
The Solution
TBS performed hydrologic and hydraulic modeling as well as topographic surveying services of the 85,000-acre Bogue Falaya drainage basin in an effort to develop an engineering solution to lessen flooding impacts to St. Tammany Parish and the Greater Covington area. The solution includes potential channel improvements and master planning a series of regional detention ponds located at strategic locations throughout the Bogue Falaya drainage basin.
Services
Feasibility/Planning/Alternatives Analysis
Unmanned Aerial/Laser Scanning Surveys
Hydrographic Surveying
Subsurface Utility Engineering
Environmental Studies/NEPA
Levee and Pump Station Design
Engineering Design – Civil & Mechanical
Administration and Management
Grant Applications/Compliance
Program Management
Topographic & Boundary Surveys
Hydraulic and Hydrologic Analysis
Drainage Impact Studies/Master Drainage Plans
Regulatory Compliance/Environmental Permitting
Bulkheads
Grant Writing
Construction Services