Atchafalaya River to Bayou Shaffer HDD

Pipeline
Resources Icon

The Challenge

To Be Met

Shell requested professional services to design a 22” line under both the Atchafalaya River (approximately 4,500 linear feet) and Bayou Shaffer (3,500 linear feet) via HDD installation methods.

Atchafalaya River with markers for horizontal pipeline drilling
light bulb icon

The Solution

Our Creative Approach

TBS has been involved in the conceptual design phase and analyzed three alternative routes based on cost, land impacts, wetland impacts, and probability of success.

Integrated Services

Making the Perfect Solution

  • Engineering Design

Related Projects

See More of Our Work