In-Line Inspection Support for 38-Mile 30″ Gas Pipeline
Pipeline
The Challenge
To Be Met
Pipeline operators must comply with current DOT regulations and physically inspect their pipelines on a regular basis. TBS consistently assists with these inspections by providing a variety of solutions.
The Solution
Our Creative Approach
TBS performed sub-centimeter level accurate RTK/GPS survey of 36 AGM locations and provided a pig tracking during ILI run through a variety of terrain utilizing all-terrain UTVs, survey boats, airboats, and a marsh buggy.