Parkway Pipeline Project

Pipeline
Resources Icon

The Challenge

To Be Met

The pipeline company needed to construct a 135-mile-long pipeline to transport refined liquid petroleum products from St. James, Louisiana to Liberty, Mississippi. Professional surveying and environmental services were required before construction could begin.

Parkway Pipeline Project Specs
light bulb icon

The Solution

Our Creative Approach

TBS provided professional surveying services, including right-of-way plat preparation, construction stakeout, and as-built survey services, hydrographic survey services, preliminary and as-built alignment sheet preparation. Additionally, TBS provided wetland delineations and protected species surveys in an effort to obtain all environmental permits required to proceed with construction of the 135-mile-long, 16-inch diameter, refined liquid petroleum products pipeline.

Integrated Services

Making the Perfect Solution

  • Alignment Sheets

  • Environmental Surveys & Permitting 

  • Right-of-Way Plats

  • Construction Staking 

  • As-Built Survey

Related Projects

See More of Our Work